![](https://sacor.com.br/wp-content/uploads/2018/08/0070825-Peregrino-field-Peregrino-field-Photo-Øyvind-Hagen-Øyvind-Hagen-Statoil-1.jpg)
Project Details
Ducts with approximately 30 km of extension interconnecting two fixed platforms to the FPSO Peregrino, in the Campos Basin.
- Project Name Peregrino
- Client Statoil/Subsea 7
- Project Location Brazil
Ducts with approximately 30 km of extension interconnecting two fixed platforms to the FPSO Peregrino, in the Campos Basin.